History: 2003: Connecting bridge Offshore platform Kizomba

The client required a connecting bridge and a work pontoon on the Caland Canal to complete an offshore platform.

Janson Bridging installed a Heavy Girder bridge, hinged to the work pontoon on the waterside and slid onto the bank on the landside.

The bridge had a length of 38 meters and a driving width of 6 meters.

Del på:

Prosjektdetaljer

Løsning
Panelbro
Type
JPB-T
Total length
38,1 meter
Veioverflate bredde
5,7 meter
Egen vekt
118 ton
Design belastning
Vehicle 50 tons
Installasjonsdato
January 2003
Demonteringsdato
November 2003