Flyover bridge for special transports in Żarnowiec
As part of the logistics operation carried out by UTC Overseas for the delivery of transformers weighing 354t and shunt reactors weighing 135t from Gdynia to Osiek Lęborskie, the JSK450 beam bridge was used to increase the parameters of the existing crossing in Żarnowiec (Pomeranian Voivodeship) as a bridge above the existing bridge (so-called flyover). The crossing, 35m long (with ramps) and 5.7m wide, was completed in just 3 hours.
Prosjektdetaljer
Løsning
Bjelkebro
Type
JSK-JBB
Lengde
35m
Bredde
5,7m
Last
Special vehicle c.400t, local public traffic