Flyover bridge in Poznań

Due to the insufficient load-bearing capacity of the existing permanent crossing, we delivered a temporary bridge which, when installed directly above the existing bridge, will enable the passage of heavy equipment (100% Eurocode LM1).

Del på:

Prosjektdetaljer

Løsning
Bjelkebro
Type
JSK-JBB
Lengde
13,5m
Bredde
3,6m
Last
Eurocode LM1
Bjelkebro