JFB bridge as railway station platform access
As a part of revitalization of a railroad in Cieszyn, Poland, new station Cieszyn - University was planned by the Polish Railways (PLK PLK). To access its platform from Kazimierza Brodzińskiego street, a pedestrian bridge was needed due to environment protection requirements. JFB access bridge was selected by the general contractor and delivered within 3 months from order. It includes specific features corresponding PKP PLK requirements, such as leading path.



Prosjektdetaljer
Løsning
                Fiber Reinforced Bridges
            Type
                JFB
            Lengde
                9m
            Bredde
                2m
            Vekt
                3000 kg
            Last
                Eurocode LM4
            Materiale på broen
                Fibre-reinforced polymere
            Topplag
                Epoxy resin, anti-slip
            